Week 26 Report

This week we have started working on the final report. We have split up responsibilities of the report to the various group members. We...

Week 23 Report

Updates: Our group had the Verification and Validation Presentation. Leading up to that, Anisha met with Sven to go over the presentation...

Week 22 Report

This week we wrote our V&V report. We also continued building our circuits and completed the preliminary circuit for both temperature and...

Week 21 Report

Our group met twice over the week to build the circuit for for the temperature sensor. The circuit is complete. We have started writing...

Week 20 Report

Our group met on Tuesday to make sure that all the parts Anisha ordered were the correct ones. We also made plans to meet on Monday to...

Week 19 Report

This week we had a team meeting to confirm which parts we were to order just to make sure we were getting everything and then we actually...

Week 18 Report

This week we ordered materials for our prototype. We continued to pick circuit designs for the various elements as well as practiced and...

Week 17 Report

Team Meeting where we discussed ordering supplies, circuit design, and whether to use an Arduino or Raspberry pi. We also discussed next...

Week 16 Report

This week we regrouped after the break to figure out what needs to get done for the rest of the semester. We determined that the first...

Week 13 Report

This week we worked on our progress report. Last, we met to divide up initial duties with Anisha researching temperature sensors, Gaby...

Week 12 Report

We had a meeting on 11/11 during team time to outline the basic elements of our progress paper. We assigned each other different parts...

Week 11 Report

This week we met with Dr. Klaesner to discuss our current ideas and the progress report/presentation. We got some clarification about...

Week 10 Report

This week, we had two team meetings. During on meeting on Friday 10/25, we went through the existing solutions we identified for the...

Week 9 Report

This week we finished the website for our group. We had the main structure of the website done before this week so we mostly had to fill...

Week 8 Report

This week was Fall Break, which meant that much of the week was spent on break apart from each other. However, on our few days back from...

Week 7 Report

At the end of last week, we finalized the Preliminary Report. This week, our main focus was the Preliminary Presentation, which Gaby gave...

Week 6 Report

This week our group wrote our Preliminary Report. We had a group meeting on Sunday 9/29 to organize what was still needed for the report...

Week 5 Report

This week: - Worked on adding contact info and team pictures to the website - Met to organize how we will each conduct individual...

Week 4 Report

This Week: At the beginning of this week, we met with Dr. Hammill again so that we could narrow down the scope of our project. He told us...

Week 3 Report

Intro and Recap: After meeting with several clients over the course of the 9/2 week, we determined that Dr. Chet Hammill’s proposed...